What You Get: A Drone Roof Survey Report (Example)

Most drone operators hand over a folder of photographs and a page of notes. Ours is built so that a landlord, a managing agent, a buyer's surveyor or a loss adjuster can act on it without ringing us. Eight parts, every photograph timed and positioned, every defect rated with a timescale, delivered within 48 hours as a PDF and a private web page you can forward.

  • 60 to 120 photosGrouped by roof section
  • Severity 1 to 5Each with a timescale
  • Time and GPSPrinted under every photo
  • 48 hoursPDF plus private web page

The Eight Parts of the Report

The pages below are an illustrative example for a Victorian terrace in south east London, written to show the structure. They are not a real property or a real client.

Part 1Cover and flight record

Drone roof survey

DRS-2026-0XX

Three-storey Victorian terrace, two pitched slopes, one back addition flat roof, two chimney stacks. South east London. (Illustrative.)

Prepared for
The client (landlord)
Prepared by
iRopeAccess Ltd
Report issued
Within 48 h of the flight
Verified by
IRATA Level 3 supervisor

Flight record

Date and window
Tue, 10:30 to 11:05
Wind
9 mph, gusting 14 mph, SW
Weather
Dry, overcast, roof dry
Pilot / observer
Named, Flyer ID on file
Aircraft
UK1 class-marked, serial recorded
Operator ID
GBR-OP-…
Authorisation
CAA Open category A1
Airspace check
Reference logged, no FRZ
Why it matters: this is the page most drone reports leave out, and the one a loss adjuster, a managing agent's auditor or a buyer's surveyor asks for first. It proves when, by whom, in what conditions and under which rules the roof was looked at.
Part 2One-page summary

Overall condition

Fair

Sound coverings with two items that will let water in this winter if left.

Items by severity

1 × 42 × 33 × 24 × 25 × 0POI × 1

Recommendations

  1. Within 0 to 6 months: re-dress and re-fix the lifted lead back gutter at chimney 2 (photos 14 to 17) and clear and re-seal the blocked outlet on the back addition flat roof (photos 41 to 43). Both are rated 4 and both should be confirmed by hand before pricing.
  2. Within 6 to 12 months: re-bed six displaced ridge tiles on the main ridge (photos 5 to 8) and repoint the open joints on the party parapet (photos 28 to 30).
  3. Monitor: moss on the north slope and hairline cracks in the chimney 1 flaunching (photos 11, 22). Re-inspect in 24 months or after the next named storm.

Observations and recommendations are kept apart: the register records what was seen, referenced to photographs; this page says what we would do about it, and we are open that we can quote for it.

Part 3Severity guide
RatingMeaningTimescaleTypical examplesRICS equivalent
1 AdvisoryCosmetic or very early wear. No action needed nowNone, monitorMoss, staining, weathered but sound pointing1
2 May cause problemsDeteriorating. Will become a defect if ignored12 to 24 monthsCorroding fixings, failed mastic, standing water, hairline cracks2
3 Needs attentionA defect. Not yet letting water in, or only in heavy weather6 to 12 monthsDisplaced ridge tile, missing mortar, slipped slate, leaking gutter joint2
4 Will cause damageAn open route for water. Internal damage likely this season0 to 6 monthsLifted or missing lead, missing tiles, blocked outlet, split membrane3
5 Health and safety riskRisk of falling material or imminent failureImmediateLoose coping over a pavement, leaning stack, hole in the roof3
POI Point of interestNot a defect. Worth knowing aboutNonePrevious repair, unusual detail, access route, old aerial fixingsn/a
Every item rated 4 or 5 is flagged "confirm by hand" in the register. The RICS column lets a buyer's surveyor drop our findings into a Level 2 or 3 report without translating.
Part 4Defect register (extract)
IdRoof sectionSev.DefectRecommended actionConfirm by handPhotos
D-01Chimney 2, back gutter4Lead back gutter lifted at the upstand, 400 mm length, daylight visible under the lapRe-dress and re-fix, replace if split; renew soakers if found shortYes14 to 17
D-02Back addition flat roof, outlet4Outlet blocked with debris, ponding 2 m², membrane lap lifting beside itClear, flush, re-seal lap, fit leaf guardYes41 to 43
D-03Main ridge3Six ridge tiles with bedding mortar missing, one displaced 20 mmLift, clean and re-bed in lime-cement mortarNo5 to 8
D-07Chimney 1, flaunching2Hairline cracking across the flaunching, pots secureMonitor; re-flaunch when the stack is next accessedNo22
Sorted by severity, so the two items that matter are at the top. Managing agents receive the register as a spreadsheet as well, for the planned maintenance schedule.
Part 5Photographs by roof section, one page each
Photo 14 of 68 Rear slope · Chimney 2 · back gutter from the north east, 45° oblique
10:42:17 51.47° N, 0.06° W 31 m above take-off Heading 212°

Observation. Lead back gutter lifted at the upstand over about 400 mm. Daylight visible under the lap. Staining on the brickwork below consistent with water tracking behind the lead.

Linked to D-01, severity 4, confirm by hand.

Each photograph is printed with the capture time, position, altitude and heading from the aircraft, so any image can be placed on the roof and, if needed, re-flown from the same spot next year for a like-for-like comparison. Sections used: Front Roof, Rear Roof, Left and Right Slopes, Ridge, Hips and Valleys, Chimney 1 to n, Gutters and Outlets, Parapets and Party Walls, Flat Roof Areas.

Part 6Not inspected
  • ✕ North west corner of the rear slope, obscured by a neighbour's sycamore. About 3 m² not seen.
  • ✕ Underside of the satellite dish bracket on chimney 1.
  • ✕ Roof void, deck, battens, felt and insulation: not visible from the air by definition.

An explicit list, every time. If an area was not seen, the report says so rather than leaving a gap for someone to assume it was fine. It is also the list we use to decide whether a rope access visit is needed to close the picture.

Part 7Limitations and basis of the report

This report records a visual inspection of the roof from the air on the date and in the conditions stated in the flight record. It is not a RICS Home Survey, a building survey, a structural assessment or a measured survey. Nothing was walked on, opened, lifted, sounded or tested. The deck, battens, underlay, insulation, fixings, internal structure and the condition of materials beneath the visible surface were not inspected. Material composition, including suspected asbestos cement, cannot be confirmed from photographs. Resolution, angle, light and obstructions limit what can be seen, and areas not inspected are listed separately.

Severity ratings describe visible condition and a recommended timescale for action. They are not a guarantee of performance or remaining life. Items marked "confirm by hand" should be inspected at close quarters, by rope access or other means, before works are specified or priced. The report is prepared for the client and property named and does not purport to be a definitive list of every defect present.

Raw images and flight logs are retained securely for three years, in line with the record-keeping period for drone operations, and are available to the client on request. Public and sample copies carry no location metadata.

Part 8Next steps, built into the web version
D-01 · Chimney 2 back gutter4
Verify by rope access Quote the repair

On the private web page every item rated 4 or 5 carries two buttons. One books the rope access verification, the other asks us to price the repair. Either way the request arrives with the report attached, and the survey fee is credited against repairs of £1,500 or more.

The PDF carries the same information without the buttons, for the file, the freeholder or the insurer.

What a Surveyor, an Insurer or a Freeholder Looks For

Provenance

Who flew, when, in what weather, under which CAA rules, with which aircraft. The flight record answers all of it on page one.

Evidence that can be placed

Time, position, altitude and heading under every photograph. A loss adjuster can tie an image to a date; a surveyor can tie it to a slope.

Ratings with timescales

A 1 to 5 scale mapped to RICS 1 to 3, so the findings slot into a Level 2 or 3 report, a Section 20 schedule or a planned maintenance budget without re-interpretation.

Honesty about limits

Observations separated from recommendations, a not-inspected list and a limitations block. No insurer pre-approves any contractor's report; what they test is whether it was candid.

Where a claim or a tender needs a hands-on opinion rather than photographs, the rope access verification turns the report into a contractor's statement of cause and a priced specification. That is the Survey & Verify option, and it is why a report from us can go further than one from a drone-only operator.

PDF, Private Web Page and the Raw Files

The PDF

The eight parts in one file, photographs at print quality, for the records, the freeholder, the solicitor or the insurer.

The private web page

The same report at a private link you can forward. Photographs zoom, the register filters by severity, the 4K fly-round plays inline, and the next-step buttons work.

The raw files

Full-resolution images with their metadata and the video, on request, for your surveyor or your own records. Kept securely for three years.

This Report, for Your Roof, in 48 Hours

From £295 + VAT for a house and £495 for a block, report included. Send the address and we check the airspace today.

Loading

Type to search. Try leak, pigeon, EWS1 or a London area.

Nothing found. Ask us directly.